No support javascript script language
Goto Main Content
:::
Sitemap
中文
Toggle navigation
Search
Search
News
Law
Convention
News
Law
Convention
Searching
Justices of the Constitutional Court
Related Websites
Sitemap
中文
:::
Location:
Home
Convention
Article Content
P
Print
Select Folders:
Save
Save
Add New Folder
Manage Folders
Article Content
Title:
APPENDIX NO.3 WITH BUDGET ATTACHMENT TO THE AGREEMENT BETWEEN THE COORDINATION COUNCIL FOR NORTH AMERICAN AFFAIRS AND THE AMERICAN INSTITUTE IN TAIWAN DATED APRIL 20,1988 (AD.1992.05.28)
Announced Date:
1992-05-28
Effective:
1992-05-28
1.Signed on March 31 and May 28,1992; Entered into force on May 28,1992.
PURPOSE:
This Appendix alters the scope and duration of the work to be p-
erformed under this Agreement as specified in Article VI thereo-
f.
SCOPE OF WORK:
The American Institute in Taiwan (AIT) on behalf of its designa-
ted representative, the Stanford Linear Accelerator Center (SLAG
) will provide the following services to the Coordination Counc-
il for North American Affairs (CCNAA) on behalf of its designat-
ed representative, the Syn-chrontron Radiation Research Center
(SRRC) under the expanded scope of the project: fabricate four
SINGLE CAVITY RF SYSTEMS with each system contained in a set of
racks including all intrarack wiring. One system is modified to
operate in the booster synchrotron, three systems are modified
to be used in the storage ring.
A separate set of chassis and modules is provided for the RF di-
stribution of the master frequency. Additionally a set of Criti-
cal spare modules is provided and an extensive list of spare pa-
rts and components has been added.
The following lists of drawings has been established for the de-
sign for the SRRC in Taiwan and forms the basis for the project:
SINGLE CAVITY SYSTEM:
125-310; 125-312; 125-313; 125-314;
125-315; 125-316; 125-317; 125-318;
125-320; 125-322; 125-323; 125-324;
125-325; 125-326; 125-329; 125-345;
ADDITIONAL ITEMS FOR
BOOSTER SYNCHROTRON;
125-311; 125-321; 125-327; 125-344;
447-080;
ADDITIONAL ITEMS FOR
STORAGE RING:
125-319;
ADDITIONAL ITEMS FOR
RF DISTRIBUTIQN:
125-310; 125-311; 125-314; 125-315;
125-328;
SPARE MODULES:
125-310; 125-311; 125-314; 125-320;
125-321; 125-322; 125-323; 125-324;
125-325; 125-327; 125-328;
RF CONTROL SYSTEM:
125-332; 125-333; 125-334; 206-300;
125-607;
SCHEDULE FOR COMPLETION OF
THREE NOT YET DELIVERED
SYSTEMS :
MONTH 123
DOCUMENTATION XXX
TESTING XXX
EFFECTIVE DATE:
This Appendix will become effective upon the date of the last s-
ignature hereafter of the representatives of The American Insti-
tute in Taiwan and The Coordination council for North American
affairs and remain in effect for the duration of the Agreement.
FOR: The Coordination Council
for North American Affairs
NAME: (Signed)
TITLE: Deputy Representative
DATE: May 28,1992
FOR: American Institute in Taiwan
NAME: (Signed)
TITLE: Deputy Managing Director
DATE: March 31,1992
BUDGET ATTACHMENT
Title: Fabricate Low Level RF Systems
Requester's Technical Contact:
Kwo Ray Cho - Taiwan
Principal Investigator:
Edward Yen - Taiwan
Proposed Project Period: June 1, 1989 to
March 31, 1992
(assuming no discontinuity of funding)
Project Scope: 1) 4 ea. 1 Cavity Low Level
RF Systems mounted in
racks including
complete wiring
2) essential spare parts
A. SALARY AND WAGES
Classification Person Days Effort Budget
Engineering 128 48.5
Drafting 50 16.7
Coordination 76 22.4
Technician 75 21.8
Fabrication 277 201.0
────
B. TOTAL, SALARIES AND FRINGE 310.4
C. PERMANENT EQUIPMENT -0-
D. EXPENDABLE MATERIALS AND
SUPPLIES 238.4
E. TRAVEL
Domestic -0-
Foreign 5.5
F. PUBLICATION COSTS -0-
G. COMPUTER COSTS -0-
H. OTHER DIRECT COSTS -0-
I. CONTINGENCY including 25% on
incomplete work 62.3
J. TOTAL DIRECT COSTS 616.6
K. INDIRECT COSTS @ 40% OF LINE J. 246.6
L. TOTAL LABORATORY COSTS 863.2