Article 7
Inspection Institute processes building telecommunication equipment and related appliance space design examination, upon completion of inspection should be comply with Telecommunication Law, Administration Procedure Law, the charging standards of building telecommunication equipment and its space, the technique regulation of indoor/outdoor telecommunication equipment engineering. Unless there is proper excuse, no refusal or discrimination in the examination and cases.
Inspection Institute should conduct examination, upon completion inspection on the same applicant design case. But if the original inspection institute didn’t allocate inspector in the county or city where the building locates, the limitation mentioned in previous sentence will not apply.
Inspection institute should verify the documents of the work completion application within 7 days from the day that the application had filed. If the documents are not complete, the institution should inform the builder of building to hand in the complement. The time limit of handing in the complement document should conform to paragraph 6, Article 12 of the regulation of building telecommunication equipment and space allocation and usage management.
Inspection Institute should keep the application case the related information after inspection, and conduct electronic storage for “Building indoor and outdoor telecommunication equipment planning/ examination drawing approval / test / inspection application form” (hereinafter referred to as “Application Form”) assign file numbers to the files according to the order of location, construction year and number, attaching the telecommunication equipment inside/outside building examination chart , telecommunication equipment inside/outside building inspection chart, construction base location diagram, telecommunication equipment vertical riser diagram and floor plan for electronic storage. The Inspection Institute should also compile the last quarter application form and submit to NCC for reference within the first week every quarter. NCC may send personal to review related information by unperiodical request.
Inspection Institute should send the qualified building location electronic file to the line basic construction committee of local internet provider send the qualified building location electronic file to NCC or database designated by NCC within 3 days after examination completion. The electronic files shall comply with the committees’ document forms and will be sent to the committee or its database.
If there’s any change of item 4,6 and 7 of provision 1, article 4, Examination Institution should report to NCC with attached changed information.
NCC may send the personal to the inspection institute to execute unperiodical inspecting tasks and the inspection institute shall not refuse.