Article 10
To apply sand and gravel excavation permit, the following documents shall be prepared and submitted to Municipal or County (city) governments. If the required documents are not collected completely, the government authority has the right to reject the application.
1. Application form and sketch of applied area.
2. Receipt of application fee.
3. Sand and gravel excavation plan and drawings.
4. Letter of consent for sand and gravel excavation from land owner, user or administrator of the applied area or certain certificates that permit the use of agree to conduct planning for public land sand and gravel excavation. For the application of costal and sea sand and gravel excavation, the above mentioned documents are not required.
5. Other related documents specified by central governing authority.
The applicant applying for sand and gravel excavation in others mining area shall provide letter of consent issued by the mining right holder before the due date set by Municipal Government at Municipal City under the direct jurisdiction of the Central Government and County and City Government at County and City. For sand and gravel excavation in others mining area but excavate different deposit, if the letter of consent can not be obtained, the reasons and documents that may prove the contact and or negotiation had been made with the mining right holder need to be provided.
The required sand and gravel excavation plan and drawings described in Paragraph 1 Subparagraph 3 need to be certified by registered professional mining engineer or other related professional engineers.
Article 11
The required sand and gravel excavation plan and drawings described in Paragraph 1 Subparagraph 3 should include the following items:
1. Excavation plan.
2. Water and soil conservation and environmental maintaining measures.
3. Land reclamation and maintaining measures after the depletion of sand and gravel or no intention to continue the operation.
4. Transportation plan.
5. Public facilities maintaining plan.
6. Drawings of sand and gravel excavating operation.
7. Surveying map of the sand and gravel excavation area.
8. Location of sand and gravel excavation area and related road map.
9. Other items that need to be included or documents required by Central Government Authority.
Article 12
Boundary of the applying area, acreage and the depth described in Article7 Paragraph 2 of this Act shall be surveyed following the procedures and methods that are promulgated by Central Government Authority.