Those applying for the issuance of a disposal permit shall submit the following documents:
I. Application form.
II. Registration approval verification documents from a government agency.
III. Personal identification document of the statutory responsible person.
IV.Qualification certificates, insurance policy datasheet (detailed) of labor insurance coverage, employee identification and written permission to check labor insurance data for disposal technicians.
V.Establishment approval documents. Those applying in accordance with the proviso in Paragraph 3, Article 3 shall submit the following documents:
(1)Waste disposal site land ownership title, land registration information and land parcel list. If the land is not self-owned, attach the landowner’s or the management agency’s letter of consent to the use of the land
(2)Pollution control plan.
(3)Waste treatment process (includes the treatment and emissions of the pollutants produced), equipments, and operating instructions.
(4)The planning of settings of waste scale-weighing equipment. Those that are unable to set scale equipment within the site may replace with a scale equipment of a neighboring same affiliated company or by a third-party notarized weighing unit to carry out the weighing.
(5)Recording system configuration plan.
VI. Environmental management and regular monitoring reports during facility construction period. However, when the case involves an existing factory or waste disposal facility in the proviso in Paragraph 3, Article 3, or involves a mobile waste disposal facility, regular monitoring reports from the facility construction period are not required.
VII. A trial operation report that includes the sources, operations, records and statistics, and mass balance. Those applying for trial operation for industrial hazardous waste shall submit all relevant analysis results for the post-treatment derivative waste.
VIII. Acceptable waste receiving quality criteria.
IX. A quality control plan for receiving waste and producing recycled products, which includes analysis items, methods, frequency and quantities.
X. An operation management record plan which includes vehicle access, receiving and delivering of material, operation, control and monitoring at storage and disposal facilities.
XI.Verification documents showing consent by the enforcement authority, disposal organization, or government-approved waste disposal site or plant to dispose the waste generated by them.
XII.Relevant construction permit or usage permit.
XIII. Disposal plan for waste that has not yet been disposed of when unable to carry out disposal operations.
XIV. Autonomic affidavit (shown in Attachment 1).
XV. Industrial waste that use final treatment method shall submit a post-closure restoration plan.
XVI. Other documents designated by the issuing authority.