Article 42
Before manufacturing or making modification to the construction elevators, the Manufacturer shall fill up the type inspection application form (Annex 1) and submit the same along with the documents listed below to local inspecting organization for approval:
1. Type of construction elevator to be tested, criteria of strength calculation and assembly sketches for the elevator applying for inspection.
2. Summary of as-required inspection equipment to be used duringr the manufacturing process.
3. Educational background and working experience of the chief designer.
4. Educational background and working experience of the construction director.
Any alteration made to the equipment stipulated in Item 2 or the personnel stipulated in Items 3,4 of the precedingParagraph shall be reported to the local inspecting organization.
The inspecting organization shall issue the Qualification Certificate of Type Inspection for Manufacturing Equipment (Annex 2) for qualifiers in the type inspection as stipulated in Paragraph 1.
The manufacture or modification work shall not be carried out without passing the inspection. However, this limitation shall not apply to the types and conditions that have already qualified through the previous type inspection process.
Article 43
When completing the installation of elevators, the Employer shall fill up the Application Form for Completion Inspection of Elevators (Annex 3) and submit the same along with the documents as shown below to the local inspecting organization for application of the completion inspection:
1. Qualification Certification for the Type Inspection of Manufacturing Facilities (the imported facilities shall be supported by thequality control related documents).
2. Area drawingsof the installation site.
3. Specification sheets of the Construction Elevators (Annex 22)
4. Strengthen Calculation basis and Assembly drawings.
Article 44
The contents of the completion inspection of the construction elevators shall consist of structure and performance inspection, load test and other as-required inspections.
The load test stipulated in the precedingParagraph shall be performed by placing a teste load weighing 1.2 times of the rated load on the carrier of the construction elevator to inspect the performance of the ascending and descending actions.
Theinspecting organization may grant the Employer a full or partial exemption from the inspection requirements stipulated in the preceding Paragraph 1 for the imported construction elevator evidenced by proper inspection certifications.
Article 45
In the course of processing the application for Completion Inspection of the construction elevators, the inspecting organization shall notify Employer of the inspection date so as to allow for preparation of the test loads and the transportation facilities as required for the load test.
Article 46
The inspecting organization shall stamp the qualification mark (annex 7) on the Specification of Elevators for those construction elevators either qualified through the completion test, or those deemed to be qualified according to Paragraph 3 of Article 44.,After being signed by the Inspector, one (1) copy of the said specification shall then be delivered to the applicant, and the qualification mark shall be printed, painted or posted at distinct location of the construction elevatorbeing inspected for easy identification.
The inspecting organization shall issue the Report for Results of Completion Inspection (Annex 23) and Qualification Certificate (Annex 24) for the construction elevators successfully qualified through the completion inspection, the maximum period of validity for the aforesaid documents shall be one ( 1) year.
The Employer shall have the aforesaid Qualification Certificate or its photocopy placed at the distinct location in the carrier of the construction elevator.
Article 47
The Employer shall fill up the Application Form for Periodic Inspection of Elevators (Annex 10) and submit the same to the inspecting organization one (1) month before the expiry of the qualification certificate for application of the periodic inspection of the construction elevators. The cranes shall be prohibited from operation, if the Employer fails to apply for the said inspection within the time limit, or the elevators fail to pass the inspection.
The contents of the periodic inspection stipulated in the preceding Paragraph shall consist of the inspections for the structure, performance of components of the construction elevator and the load test as well as other test items as required.
The load test as stipulated in the preceding Paragraph shall be carried out for inspection of the performance of the ascending and descending actionsby placing a test load equal to the movable load at the rated speed. However, the said load test may be exempted if the inspecting organization deems it unnecessary.
The provisions of the preceding Article 45 shall apply mutatis mutandis to the load test stipulated in the preceding Paragraph 2.
Article 48
The inspection organization shall sign on the original qualification certificate and shall also remark thereon the extended service validity period(1 year as the maximum) for elevators having passed the periodic inspection.
The Inspector shall fill upthe Report for the Result of Periodic Inspection for Construction Elevators (Annex 25) upon completion of the periodic inspection and notify the employer of the inspection results accordingly.
Article 49
To make alterations to any of the following components of the elevator, the Employer shall submit the drawings relating to the components to be altered to the inspecting organization for information and auditing:
1. Windlass
2. Prime motor
3. Steel wire or hoisting chain
4. Braking devices
The requirements stipulated in the preceding Paragraph 1 is not applicable to those alterations made to the above listed components where the involved materials, specifications and dimensions remain unchanged.
Article 50
In case alterations are made to the original construction elevators by changing the loading carrier, counterweight, pathway tower, guiderail supporting tower or lifting cables, the Employer shall fill up and submit an Application Form(Annex 12), accompanied with the drawings relating to the said alterations, to the Inspection Organization to apply for the alteration inspection of elevators.
The date and results of the alteration inspection as well as the altered portions shall be so remarked in the original qualification certificate by the inspecting organization for those elevators being qualified by the said alteration inspection.
The requirements stipulated in Articles 44 and 45 shall apply mutatis mutandis to the alteration inspection stated in the preceding paragraph 1.
Article 51
If the idle construction elevators which have been out of service beyong their valid period of the qualification certificate of inspection for over one (1) year , are intended to be reused, the Employer shall fill up the Application Form for Re-inspection of Elevators (Annex 13) and submit the same to the inspecting organization to apply for re-inspection.
The inspecting organization shall record the date and results of inspection and the extended service life (1 year as the maximum) on the original qualification certificate for the inspection for the elevators being qualified through the re-inspection.
The provisions stated in Articles 44 and 45 shall apply mutatis mutandis to the alteration inspection stipulated in Paragraph 1.